View All E-S4HCON2022 Actual Free Exam Questions May 08, 2023 Updated [Q20-Q39]

Share

View All E-S4HCON2022 Actual Free Exam Questions May 08, 2023 Updated

Pass Authentic SAP E-S4HCON2022 with Free Practice Tests and Exam Dumps


The SAP E_S4HCON2022 certification is intended for SAP technical consultants, system administrators, and IT professionals who want to upgrade their skills and knowledge in SAP systems. The exam provides an opportunity to demonstrate your expertise in SAP systems and increase your credibility as a SAP professional. It is also a valuable asset for organizations looking for skilled professionals to manage their SAP systems.

 

NEW QUESTION # 20
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

  • A. The transport between Unicode and non-Unicode systems is forbidden.
  • B. The upgrade of the PRD must be finished before you start new development in the DEV.
  • C. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
  • D. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.

Answer: D


NEW QUESTION # 21
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. An SAP S4HANA 1709 sandbox system
  • B. A Standalone SAP system with ABAP 7.51 or above
  • C. AA

Answer: A,B


NEW QUESTION # 22
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

  • A. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
  • B. The SAP support packages that will be bound to the conversion
  • C. The SAP support packages of the support package stack, calculated by the maintenance planner
  • D. The SAP support packages in the download directory that are newer than the selected support package stack

Answer: D


NEW QUESTION # 23
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests named <SID>K0<number>
  • B. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • C. By searching for transport requests in the file umodauto.Ist
  • D. By searching for transport requests that are assigned to the project SAP_ADJUST

Answer: C


NEW QUESTION # 24
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

  • A. Downtime Optimized Data Conversion (DoC)
  • B. Near-Zero Downtime Maintenance (nZDM)
  • C. Downtime Optimized DMO (DoDMO)
  • D. Near-Zero Downtime Technology (NZDT)

Answer: D


NEW QUESTION # 25
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:

  • A. To make the progress information within SUM UI more accurate
  • B. To auto-fill specific fields on selected screens on the SUM UI
  • C. To repeat specific phases during the SUM run
  • D. To skip selected phases during the SUM run

Answer: A


NEW QUESTION # 26
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • C. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • D. After the SUM roadmap step "Execution" is finished and before "Postprocessing"

Answer: A


NEW QUESTION # 27
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:

  • A. /ASU/START (Start ASU Toolbox)
  • B. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
  • C. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
  • D. /ASU/SSM (ASU Simple Schedule Manager)

Answer: A


NEW QUESTION # 28
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In Process Control Center
  • B. In SUM Parameters
  • C. In DMO Migration Preparation
  • D. In SUM Phaselist

Answer: A,B


NEW QUESTION # 29
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:

  • A. The major SUM Guide
  • B. The DMO Guide
  • C. The SAP S/HANA Conversion Guide
  • D. The Application Guide

Answer: B,C


NEW QUESTION # 30
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Linux, SAP HANA
  • B. Kernel for source release, Windows, SAP MaxDB
  • C. Kernel for target release, Windows, SAP HANA
  • D. Kernel for target release, Windows, SAP MaxDB

Answer: B,C


NEW QUESTION # 31
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • B. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • C. Network capacity between exporting and importing R3load processes must be.
  • D. The target database size increases temporarily because of the Shadow Repository.
  • E. The source system is non-Unicode and the target database is a scale-out system.

Answer: A,B


NEW QUESTION # 32
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

  • A. Apply the corresponding SAP note via SAP Note Assistant
  • B. Download it from SAP Support Portal
  • C. Configure it within transaction ATC
  • D. Generate it by analyzing the specific custom code via RFC

Answer: B


NEW QUESTION # 33
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Uninstall industry extensions not supported by SAP S/4HANA
  • B. Delete client 066 (Early Watch Client)
  • C. Install add-on SAP Gateway 7.50
  • D. Uninstall Fiori apps not released for SAP_UI 7.50

Answer: B,D


NEW QUESTION # 34
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Run the database migration to the SAP HANA database
  • B. Apply the recommendations of the simplification list
  • C. Check the compatibility of custom code with SAP S/4HANA
  • D. Perform the migration of data into the new data structure

Answer: B,C


NEW QUESTION # 35
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • B. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
  • C. Depending on the SAP S/4HANA version, there are different SI check frameworks.
  • D. You need to build up a SI check framework by applying SAP notes.

Answer: C,D


NEW QUESTION # 36
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.

  • A. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • B. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • C. Network capacity between exporting and importing R3load processes must be.
  • D. The target database size increases temporarily because of the Shadow Repository.
  • E. The source system is non-Unicode and the target database is a scale-out system.

Answer: A,B


NEW QUESTION # 37
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

  • A. The path was stored to the environment of user <sid>adm during registration
  • B. The path is taken from the URL entered in the browser to start SUM
  • C. The path was stored in file host_profile during registration
  • D. The path was stored in file sumabap conf during registration

Answer: D


NEW QUESTION # 38
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SUM without DMO
  • B. SWPM using the Backup / Restore procedure
  • C. SUM with DMO
  • D. SWPM using the Load procedure

Answer: D


NEW QUESTION # 39
......

New E-S4HCON2022  Exam Questions Real SAP Dumps: https://freedumps.validvce.com/E-S4HCON2022-exam-collection.html