Preparation hints and test-taking tips belong in a study product as much as questions do — ValidVCE pairs its C9010-250 bank with guidance that identifies weak areas and sharpens both conceptual knowledge and hands-on skills.
IBM C9010-250 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Topic 1: Sales Opportunity Identification | - Sales engagement
|
| Topic 2: Software, Services and Financing | - IBM ecosystem
|
| Topic 3: Solutions and Workloads | - Platform solutions
|
| Topic 4: Business Value and Competitive Positioning | - Customer business requirements
|
| Topic 5: IBM Power Systems with POWER8 Portfolio | - POWER8 server family overview
|
IBM Power Systems with POWER8 Sales Skills V1 Prep: What Matters More Than Volume
- Solutions and Workloads ()
- IBM Power Systems with POWER8 Portfolio ()
- Sales Opportunity Identification ()
IBM Power Systems with POWER8 Sales Skills V1 Sample Questions:
A customer states that up time is very critical in their environment.
What should the IBM reseller tell the customer?
- A. Power Systems are the most reliable non-mainframe systems.
- B. IBM's high availability solution has instant failover resulting in zero down time.
- C. IBM's POWER8 Enterprise systems offer a fault tolerant solution.
- D. IBM POWER8 technology offers concurrent maintenance on all components.
Correct Answer: C 🗳️
Explanation: Only visible for ValidVCE members. You can sign-up / login (it's free).
A customer is running a critical and large Oracle Database on x86 servers in an 8-node RAC cluster. The client has regular outages and poor performance.
Which POWER8 advantage is most relevant to the customer?
- A. Near linear scaling
- B. License savings
- C. Service Processor
- D. ECC memory
Correct Answer: A 🗳️
Explanation: Only visible for ValidVCE members. You can sign-up / login (it's free).
A customer has a BladeCenter S (BCS) with an 8-core POWER6 blade, 1.5TB of storage and an external LTO tape drive installed. They want to upgrade to a P0WER8.
Which of the following is the lowest cost recommendation to satisfy their requirement?
- A. POWER8 blade in the current BCS
- B. S824
- C. S814
- D. Flex System and POWER8 node
Correct Answer: C 🗳️
Explanation: Only visible for ValidVCE members. You can sign-up / login (it's free).
A customer is currently booting a 770 with internal storage, and wants to maintain a local boot option on an E870.
What local boot option is valid for the E870?
- A. Storage in the CEC
- B. Storage in the System Control Unit
- C. Storage in the disk expansion drawer
- D. Storage on the SAN
Correct Answer: A 🗳️
Explanation: Only visible for ValidVCE members. You can sign-up / login (it's free).
A customer wants to use a virtualization technology that has a consistent interface across both the x86 and Power platforms.
Which hypervisor for Power Systems will satisfy their requirement?
- A. HyperV
- B. PowerKVM
- C. PowerVM
- D. VMware
Correct Answer: C 🗳️
Explanation: Only visible for ValidVCE members. You can sign-up / login (it's free).
Viewing page 1 out of 22 pages.
Viewing questions 1-5 out of 108 questions.


1062 Customer Reviews

